2017, February, the national electric power personal accident liability accident 3, the death of 3 people, representing a decrease of up to 1, the death toll was reduced by 6. The production of human power casualty accidents since 3, 3 people died, since the number unchanged from a year earlier, reducing the number of deaths of 2 people; no personal injury accidents of electric power construction, has an 1 reduction in the number of deaths of 4 people. Natural disasters caused by personal injury accidents 1, the death of 1 people, an increase of up to the number of cases from the beginning of the year, the death toll increased by 1 people.
In February, there was no direct economic losses of more than 1 million yuan of power equipment accidents, unchanged from the same period last year. Electric safety incidents occurred 1 onwards, an increase of up to the number of up to 1.
In February, the country did not occur over a large power accident, no power equipment accidents, no power system of hydropower station dam, overtopping and significant impact of social events.
Electric personal casualty accident
1, February 12th, three workers in Harbin handling transport limited company No. 4 boiler electric dust shaker inspection work in Huadian Group Harbin third power plant, electric shock occurred open insulation box, resulting in 1 deaths.
2, February 17th, workers in Guangdong heavy machinery maintenance service limited company of instrument maintenance in limestone dump skip Guangdong group belongs to Zhuhai power plant, was involved in the elevator, killing 1 people.
3, February 24th, Jiangsu Changshu anti-corrosion insulation engineering limited liability company of China Power Investment in the Changshu power generation limited liability company No. 4 boiler air preheater of top rainproof shed anticorrosive paint job, workers from the top of the canopy to prevent (elevation 31 meters) slip fell to zero meter ground, killing 1 people.
Casualties caused by natural disasters
In February 23rd, Shaanxi Hanzhoung aviation human resources limited liability company in Shaanxi local power company power supply troubleshooting Zhenba 35 thousand volt switch trip during long time because of the Snowstorm Weather lead to the line tension is too large, workers in the cross arm insulator replacement and correction, pole dumping, killing 1 people.
Electric safety incident
In February 22nd, the Guangdong Power Group Guizhou Guizhou Guangdong Electric Power Co. Ltd. Pannan power plant (4 * 600 thousand KW) 500 thousand volt booster station 5022 switch A CT exploded, resulting in 1, 2, 3 trip unit (unit 4, when the total trip stop preparation) load of 1 million 340 thousand KW power plant caused by foreign.